view Details (7-2016) Wabag / SPS / AMI

2X1000 KVA gen sets synchronized together have been installed on site in Suez Drinking Water Station. The contract signed between Wabag, Austria & SPS, UK for supplying the system, installation done under AMI supervision – SPS local agent in Egypt.